hi boy
"Ugol" magazin

SURFACE MINING


Original Paper

UDC 622.831.3: 622.271© N.M. Zamaliev, Zh.D. Zhalbypov, N.G. Valiev, D.R. Akhmatnurov, A.T. Zhansejtov, 2024

ISSN 0041-5790 (Print) • ISSN 2412-8333 (Online) • Ugol’ – Russian Coal Journal, 2024, № 2, pp. 58-64

DOI: http://dx.doi.org/10.18796/0041-5790-2024-2-58-64

Title

DEVELOPMENT OF PROPOSALS TO IMPROVE THE IN PIT CRUSHING AND CONVEYING SYSTEM (IPCC) FOR THE BOZSHAKOL DEPOSIT

Authors

Zamaliev N.M.1, Zhalbypov Zh.D.1, Valiev N.G.2, Akhmatnurov D.R.1, Zhansejtov A.T.3

1Abylkas Saginov Karaganda Technical University, Karaganda, 100029, Republic of Kazakhstan

2Urals State Mining University, Ekaterinburg, 620144, Russian Federation

3Academy of Public Administration under the President of the Republic of Kazakhstan, Karaganda, 100029, Republic of Kazakhstan

Authors Information

Zamaliev N.M., Doctor PhD Department of Development of mineral deposits, e-mail: nailzamaliev@mail.ru

Zhalbypov Zh.D., Doctoral student Department of Development of mineral deposits, e-mail: zhanibek_zhalbyrov@mail.ru

Valiev N.G., Doctor Engineering Sciences, Professor, Head of the Mining Department, e-mail: Niyaz.Valiyev@m.ursmu.ru

Akhmatnurov D.R., Doctor PhD Department of Development of mineral deposits, e-mail: d.akhmatnurov@gmail.com

Zhansejtov A.T., Magister, e-mail: a.zhanseitov@apa.kz

Abstract

The purpose of the paper is to assess the impact of the elevator conveyor angle on the volume of mining and development work in open pits that use the In Pit Crushing and Conveying System (IPCC) for ore mining. Numerical modeling combined with monitoring techniques was used as the main research method. In addition, strain points were calculated based on seismological and geological data. The econometrics of the rationale for using the incline conveyor was performed with indication of the share of costs, energy benefits, as well as the prospects for further use of the IPCC. Specific effects of the elevator conveyor angle on the volume of mining and development work have been discussed for the open pits where ore is mined using the In Pit Crushing and Conveying (IPCC) system. The economic viability of this technology has been justified, the environmental performance and efficiency of using conveyors within the IPCC systems have been analyzed, as well as the impact of the elevator conveyor angle on the volume of mining and the availability of the conveyors. The results of the research can be used both by mining companies and as part of more detailed studies of ore mining.

Keywords

Open-Pit, In Pit Crushing and Conveying (IPCC) system.

References

1. Thorsten Kratz & Per Nicolai Martens. Optimization of mucking and hoisting operation in conventional shaft sinking.Available at: https://mining-report.de/english/optimizing-of-mucking-and-hoisting-operation-in-conventional-shaft-sinking/ (accessed 15.01.2024).

2. Bazalyuk O., Rysbekov K. & Nurpeisova M. Integrated monitoring for the rock mass state during large-scale subsoil development. Available at: https://www.researchgate.net/publication/360189569_Integrated_Monitoring_for_the_Rock_Mass_State_During_Large-Scale_Subsoil_Development (accessed 15.01.2024).

3. Begalinov A., Khomiakov V., Serdaliyev Ye. & Iskakov Ye. Formulation of methods reducing landslide phenomena and the collapse of career slopes during open-pit mining. Available at: https://www.researchgate.net/publication/341201652_Formulation_of_methods_reducing_landslide_phenomena_and_the_collapse_of_career_slopes_during_open-pit_mining (accessed 15.01.2024).

4. Dotson K.B. & Hethmon Th.A. Methods of open pit mining. Available at: https://www.iloencyclopaedia.org/part-xi-36283/mining-and-quarrying/item/599-surface-mining-methods (accessed 15.01.2024).

5. Ivanova M.S., Konoval S.V. & Abed S.F. Improvement the calculation of the stability of buildings located near the slopes for structural unstable soils. Available at: https://cyberleninka.ru/article/n/improvement-the-calculation-of-the-stable-of-building-located-near-the-slopes-for-structural-unstable-soils (accessed 15.01.2024).

6. Melikhov M.V. A conception of construction of temporary anti-roсkfall facilities on the open pits. Problemy nedropol?zovaniya, 2018, (2), pp. 130-140. (In Russ.).

7. Tomilina N.G., Burmistrov K.V. & Gavrishev S.E. Increasing the work scope of conveyor transport at mining companies. Available at: https://www.researchgate.net/publication/305790181_Increasing_the_Work_Scope_of_Conveyor_Transport_at_Mining_Companies (accessed 15.01.2024).

8. Kamarov R.K., Zamaliyev N.M., Akhmatnurov D.R. & Musin R.A. Setting the volume and location of the gas collectors of abandoned coal mines. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, 2018, (2), pp. 5–11. DOI: 10.29202/nvngu/2018-2/2.

9. Management of open-pit slope stability in Russia. Available at:  https://www.srk.com/en/publications/regulation-of-open-pit-slope-stability-in-russia (accessed 15.01.2024).

10. An overland tubular conveyor with 22 horizontal and 45 vertical bends to connect a coal mine to a railway loading depot.Available at:  https://www.pipeconveyor.com/Case%20Studies/Skyline%20Mine/overland.htm (accessed 15.01.2024).

For citation

Zamaliev N.M., Zhalbypov Zh.D., Valiev N.G., Akhmatnurov D.R. & Zhansejtov A.T. Development of proposals to improve the In Pit Crushing and Conveying System (IPCC) for the Bozshakol deposit. Ugol’, 2024, (2), pp. 58-64. (In Russ.). DOI: 10.18796/0041-5790-2024-2-58-64.

Paper info

Received October 20, 2023

Reviewed January 15, 2024

Accepted January 26, 2024

SPECIAL ISSUE




Hot from the press
Partners