GEOTECHNOLOGY


STUDY OF THE UNEVEN OPERATION OF THE EXCAVATOR-TRUCK COMPLEX

Original paper

UDC 622.271.3 c O.I. Litvin1, Ya.O. Litvin2, A.A. Khoreshok1, D.M. Dubinkin1, S.O. Markov1, 2025

ISSN 0041-5790 (Print) • ISSN 2412-8333 (Online) • Ugol’ – Russian Coal Journal, 2025, № 12

DOI: http://dx.doi.org/10.18796/0041-5790-2025-12-116-120

Authors

O.I. Litvin, Ya.O. Litvin, A.A. Khoreshok, D.M. Dubinkin, S.O. Markov

1 T.F. Gorbachev Kuzbass State Technical University, Kemerovo, 650000, Russian Federation

2 Mokhovsky Coal Mine, 652661, Mokhovo Village, Kemerovo Region, Russian Federation

e-mail: ddm.tm@kuzstu.ru

Authors Information

Litvin O.I. – PhD (Engineering), Associate Professor, Senior Researcher of the Department of Open-Pit Mining, T.F. Gorbachev Kuzbass State Technical University, Kemerovo, 650000, Russian Federation

Litvin Ya.O. – PhD (Engineering), Director of the Mokhovsky Coal Mine, 652661, Mokhovo Village, Kemerovo Region, Russian Federation

Khoreshok A.A. – Doctor of Engineering Sciences, Professor, Scientific Director of the Mining Institute, T.F. Gorbachev Kuzbass State Technical University, Kemerovo, 650000, Russian Federation

Dubinkin D.M. – PhD (Engineering), Associate Professor, Associate Professor of the Department of Mining Machines and Complexes, T.F. Gorbachev Kuzbass State Technical University, Kemerovo, 650000, Russian Federation, e-mail: ddm.tm@kuzstu.ru

Markov S.O. – PhD (Engineering), Associate Professor, Associate Professor of the Department of Open-Pit Mining, T.F. Gorbachev Kuzbass State Technical University, Kemerovo, 650000, Russian Federation, e-mail: markovso@kuzstu.ru

Abstract

The actual or operational number of quarry dump trucks required to work with a single unit of excavation and loading equipment is usually determined by rounding the calculated value depending on the availability of dump trucks or existing experience in operating excavator-truck complexes by adding a dump truck with a lower load capacity to the transport chain. This paper presents a possible option for equipping the transport chain with an increased number of dump trucks to reduce the downtime of the main excavator.

Keywords

Excavator productivity, dump truck productivity, hydraulic excavator, excavator and truck complex, open-pit mining.

References

  1. Об изменении производительности обратных гидравлических лопат при разных схемах погрузки вскрыши в карьерные самосвалы / А.А. Хорешок, Д.М. Дубинкин, Я.О. Литвин и др. // Известия высших учебных заведений. Горный журнал. 2024. № 4. С. 26-34. DOI: 10.21440/0536-1028-2024-4-26-34.
  2. Loginov E.V., Kara S.V., Masalskiy S.S., Petrov K.D. Justification of parameters of open pit mining using truck-and-shovel systems in the Extreme North. MIAB. Mining Inf. Anal. Bull. 2024;(6):17-30. DOI: 10.25018/0236_1493_2024_6_0_17.
  3. Dubinkin D.M., Khoreshok A.A., Ismailova Sh.Ya., Markov S.O. Investigation of the effect of changes in the height of the ledge on the current stripping coefficient when using autonomous mining dump trucks with a lifting capacity of 240 tons. Mining engineering and technology. 2023;3(22):71-81. DOI: 10.26730/2618-7434-2023-3-71-81. (In Russ.).
  4. Katsubin A., Markov S., Khoreshok A., Tyulenev M. Selection of Excavating Equipment for the Outpacing Development of the Coal-bearing Zone. E3S Web of Conferences. 2020;174:01027. DOI: 10.1051/e3sconf/202017401027.
  5. Litvin O.I., Litvin Ya.O., Tyulenev M.A., Markov S.O. On determining the parameters of downhole blocks during mining operations with reverse hydraulic shovels. Mining Industry. 2021;(6):76-81. DOI: 10.30686/1609-9192-2021-6-76-81. (In Russ.).
  6. Markov S., Tyulenev M., Dubinkin D., Murko E. Estimation of Excavator-Automobile Complex Productivity at Changing of Engineering and Geological Conditions. Acta Monstanistica Slovaca. 2024;29(3):643-653.
  7. Ermolaev V.A., Selyukov A.V. Comparison of mining and geological conditions of quarry operations. Mining engineering and technology. 2018;2(2):50-65. DOI: 10.26730/2618-7434-2018-2-50-65. (In Russ.).
  8. Litvin O.I., Markov S.O., Khoreshok A.A. et al. Determination of the area of the energy-efficient position of the working equipment and the effective radius of scooping hydraulic excavators in open-pit mining. Surveying and subsoil use. 2022;4(120):38-44. DOI: 10.56195/20793332_2022_4_38. (In Russ.).
  9. Strelnikov A.V. Typical faces passports for the development of coal-bearing zones of Kuzbass quarry fields with backhoes. Part 1. Journal of Mining and Geotechnical Engineering. 2019;3(6):4-20. DOI: 10.26730/2618-7434-2019-3-4-20.
  10. Strelnikov A.V. Typical faces passports for the development of coal-bearing zones of Kuzbass quarry fields with backhoes. Part 2. Journal of Mining and Geotechnical Engineering. 2019;4(7):4-29. DOI: 10.26730/2618-7434-2019-4-4-29.
  11. Tyulenev M., Markov S., Zhironkin S. et al. The Choice of Technology and Equipment for Coal Seams of Different Bedding Excavation at Kuzbass Surface Mines Based on Digging Capacity and Unit Costs. Acta Montanistica Slovaca. 2021;26(4):603-619. DOI: 10.46544/AMS.v26i4.02.
  12. Ulewicz R., Krsti? B., Ingaldi M. Mining Industry 4.0 – Opportunities and Barriers. Acta Montanistica Slovaca. 2022;27(2):291-305.
  13. Kozel R., B?lica J., Kempa F., Chlopecky J., Grycz O., Cehlar M. Waste management systems in the context of sustainability. Acta Monstanistica Slovaca. 2024;29(1):180-192. DOI: 10.46544/AMS.v29i1.16.
  14. Ambri?ko L., Marasova D., Grendel P., Luka? S. Application of logistics principles when designing the process of transportation of raw materials. Acta Montansitica Slovaca. 2015;20(2):141-147.

Acknowledgements

This work was financially supported by the Ministry of Science and Higher Education of the Russian Federation under Agreement № 075-15-2022-1198 dated 30.09.2022 with the Gorbachev Kuzbass State Technical University on complex scientific and technical program of full innovation cycle: “Development and implementation of complex technologies in the areas of exploration and extraction of solid minerals, industrial safety, bioremediation, creation of new deep conversion products from coal raw materials while consistently reducing the environmental impact and risks to human life” (the “Clean Coal – Green Kuzbass” Integrated Scientific and Technical Programme of the Full Innovation Cycle) approved by Order No. 1144-р of the Government of the Russian Federation as of May 11, 2022, as part of implementing the project “Development and creation of an unmanned shuttle-type mine truck with a payload of 220 tonnes” in terms of research, development and experimental-design work.

For citation

Litvin O.I., Litvin Ya.O., Khoreshok A.A., Dubinkin D.M., Markov S.O. Study of the uneven operation of the excavator-truck complex. Ugol’. 2025;(12):116-120. (In Russ.). DOI: 10.18796/0041-5790-2025-12-116-120.

Paper Info

Received October 3, 2025

Reviewed November 15, 2025

Accepted November 28, 2025